When this option is checked, each factory count will be rounded up to the nearest whole number before calculating the total.
Substation

Substation

Obtaining:

Recipe
Ingredients
Facility
Products
Substation
5
Advanced circuit
Advanced circuit
600 / min
6
Copper cable
Copper cable
720 / min
10
Steel plate
Steel plate
1200 / min
Assembling machine
0.5 seconds
1
Substation
Substation
120 / min